Passer aux informations sur le produit
GPS Pet Tracker | Real-Time Location
$54.99
Prix promotionnel
$54.99
Prix régulier
🚚 Ships to 🇺🇸 USA & 🇨🇦 Canada · Free shipping over $75 · 📦 Delivery 3–15 days
Keep your pet safe with real-time GPS tracking that lets you know exactly where they are at any moment. This lightweight tracker provides peace of mind whether your pet is exploring the backyard or on an adventure, so you can respond quickly if they wander too far.
- Real-time location tracking with GPS positioning accuracy
- Multiple alarm modes including geofence alerts to notify you if your pet leaves a designated safe area
- Vibration and mobile alarm options for discreet notifications
- Long battery life keeps the tracker running for extended periods between charges
- Waterproof design protects against water exposure during outdoor play and wet weather
- Compact size fits comfortably on most pet collars without adding bulk or weight
Details
Material: ABS
GPS positioning accuracy: 5m
Alarm modes: vibration alarm, fence alarm, overspeed alarm, mobile alarm
Dimensions: 66×52×44mm
Battery type: polymer battery
Battery life: 240 hours
Waterproof rating: IP67
Antenna type: GSM
Power: USB charging
